admin

You are here:
Rio Tinto at Parker Point

PCM GROUP PTY LTD secured its first direct contract with Rio Tinto in Australia in 2023. The award was a multi-million dollar contract forming part of the structural integrity program at Rio Tinto’s Parker Point site in Dampier, WA.The project saw PCM Group deliver remediation services to 122 piles at Parker Point wharf, with PCM…

Read article
Fremantle Port

Since 2019 PCM Group have been providing ongoing industrial maintenance services to Fremantle Port Authority in Western Australia. The integrated service offering includes painting, blasting, washdown services and associated waste removal services via our 10,000 litre capacity King Vac vacuum truck. In addition to these daily services PCM Group delivered hydro demolition and concrete repair…

Read article
Darwin Port

This project was awarded to PCM Group to replace the corroded sprinkler system under BLB wharf at East Arm port. Project disciplines included fabrication of a new Press fit pipe system of more than 300LM of pipes of different sizes, it is delivered to site and installed in place after removing and safely disposing the…

Read article
Austal Ships

PCM Group supplies a suite of services to the Defence sector. Over the past 12 years PCM Group has carried out multiple services on the Armidale Class, Cape Class and support vessels where services range from hydro blasting, abrasive blasting, application of high performance silicone below water line systems, internal tank refurbishment of black and…

Read article
INPEX

Over the past 3 years PCM Group has been carrying out fabric maintenance scopes at ILNG under our contract with Trace JV. The large scale scopes consist of Insulation & Cladding, Scaffolding, Protective Coatings, Abrasive & Water blasting, Stopaq and Humidur application. This contract has been instrumental in securing 100% local workforce and allowing PCM…

Read article
Dalrymple Bay Coal

PCM GROUP PTY LTD is delighted to announce the award of its first contract with Dalrymple Bay Coal Terminal Pty Ltd. Bay Coal Terminal in Mackay. The award is a multi-million dollar contract for protective coatings and structural maintenance remediation, comprising a total of five independent scopes of work across the coal terminal. The project…

Read article
Onslow Salt

PCM Group have carried out successful shutdown works for Onslow Salt over the past 2 years, with the successful award of the ongoing Maintenance contract in early 2020 including refurbishment of the reclaimer, stacker, jetty, and other various Onslow Salt assets utilizing Painting, Blasting, Boiler Making, Scaffolding, and Rope Access solutions. PCM Group has a…

Read article
Nystar Hobart

PCM Group successfully completed its first significant project scope with Nyrstar at its zinc refinery in Hobart, Tasmania. The project scope saw PCM Group deliver high pressure cleaning, specialist tiling and membrane works to the new gas cooling tower area on completion of initial civil works. The PCM Group team pressure washed the existing bund,…

Read article
CBH Albany

PCM Group embarked on a long term project with CBH Group (Albany) in 2023. The scope consists of erecting specialised Layher Allround access systems, and coatings remediation to the underside galleries at the Albany Grain Terminal. PCM Group, successfully completed a critical modular crane lift of two complete scaffold bridges, installing them to 2 x…

Read article
Diamantina Power Station

PCM Group were engaged by APA Group to provide concrete remediation and coating services to the ST 10 Sulphuric Acid bund at Diamantina Power Station in Mt.Isa Queensland. The concrete bund was cleaned to remove all delaminated concrete and existing coating. Sweep blasting and high pressure wash to 5000psi. Screed was prepared and substrate and…