Dalrymple Bay Coal

PCM GROUP PTY LTD is delighted to announce the award of its first contract with Dalrymple Bay Coal Terminal Pty Ltd. Bay Coal Terminal in Mackay. The award is a multi-million dollar contract for protective coatings and structural maintenance remediation, comprising a total of five independent scopes of work across the coal terminal. The project…

Details

Onslow Salt

PCM Group have carried out successful shutdown works for Onslow Salt over the past 2 years, with the successful award of the ongoing Maintenance contract in early 2020 including refurbishment of the reclaimer, stacker, jetty, and other various Onslow Salt assets utilizing Painting, Blasting, Boiler Making, Scaffolding, and Rope Access solutions. PCM Group has a…

Details

Nystar Hobart

PCM Group successfully completed its first significant project scope with Nyrstar at its zinc refinery in Hobart, Tasmania. The project scope saw PCM Group deliver high pressure cleaning, specialist tiling and membrane works to the new gas cooling tower area on completion of initial civil works. The PCM Group team pressure washed the existing bund,…

Details

CBH Albany

PCM Group embarked on a long term project with CBH Group (Albany) in 2023. The scope consists of erecting specialised Layher Allround access systems, and coatings remediation to the underside galleries at the Albany Grain Terminal. PCM Group, successfully completed a critical modular crane lift of two complete scaffold bridges, installing them to 2 x…

Details

Diamantina Power Station

PCM Group were engaged by APA Group to provide concrete remediation and coating services to the ST 10 Sulphuric Acid bund at Diamantina Power Station in Mt.Isa Queensland. The concrete bund was cleaned to remove all delaminated concrete and existing coating. Sweep blasting and high pressure wash to 5000psi. Screed was prepared and substrate and…

Details

Berth 3 Pile Refurbishment

PCM Group collaborated with Pilbara Port Authority to deliver a comprehensive range of services aimed at refurbishing and enhancing the structural integrity of the wharf facility. These services included: high-pressure hydro blasting, abrasive blasting, advanced scaffolding and encapsulation, protective coating applications, wrapping systems, and fabrication works. The refurbishment of 240 full piles, each pile refurbishment…

Details