PCM Group were awarded the Parker Point Phase A Wharf Piles Project in August 2023 to execute 100 wharf piles to remediate the structural integrity of the RTIO wharf at Dampier Port, Western Australia.
Our team consisting of Scaffolders, Boilermakers, Painters and Vessel operators worked safely in harsh marine conditions through cyclonic weather and tidal restricted elements to ensure the quality of workmanship was never compromised throughout the project. Our high level of professionalism and quality of personnel reassured our client that the works being completed were done safely and on schedule with zero LTI’s for the duration of the project.


PCM Groups work scope expanded in May/June with the data recorded for deterioration of the structural piles to fabricate circumferential sleeve repairs to all piles throughout this phase to guarantee longer life of the asset for our client, mitigation processes were implemented and executed to high standards to safely perform the additional works.
The PCM Group team culture, positiveness and experience proved to our client that all works executed were done in accordance with AS/NZ Standards and site specification. Our scaffold designs to gain safe access to our work front were all engineered by structural professionals to commit to safely completing all tasks with each discipline of works.
We at PCM Group are proud of the works and reputation we have established during this project to guarantee all our hard work creates a positive culture for all our clients now and into the future.